ITAC Assessment: MA0607
ITAC logo
ITAC Assessment: MA0607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Jet Engine Components
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $5
M
to 10
M
# of Employees 1,500
Plant Area 968,000
ft2
Annual Production 105,000
units
Production Hrs. Annual 8,590
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,935,943 52,122,000
kWh
Electricity Demand $652,022 95,781
kW-mo/yr
Electricity Fees $19,416 -
Natural Gas $333,434 20,373
MMBtu
Fuel Oil #6 $822,981 101,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $149,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Ancillary Material Cost Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $46,963 - $123,310
2,242,000
kWh
$12,133
-
kW-mo/yr
- $(-83,436.0)
-
MMBtu
$(-5,044.0)
02 2.7314: Reduce ventilation air $45,943 $10,400 $7,205
131,000
kWh
$385
-
kW-mo/yr
- $38,353
-
MMBtu
-
03 2.1331: Burn a less expensive grade of fuel $14,261 $5,500 $3,306
60,100
kWh
- $42,958
-
MMBtu
$(-32,003.0)
-
MMBtu
-
04 2.7314: Reduce ventilation air $12,889 $1,700 $594
10,800
kWh
- - $12,295
-
MMBtu
-
05 2.8122: Use utility controlled power management $12,223 $14,000 $333
600
kWh
$12,000
-
kW-mo/yr
$(-101.0)
-
MMBtu
- $(-9.0)
06 2.7311: Ventilation system to shut off when room is not in use $10,577 $1,870 $1,997
36,300
kWh
- - $8,580
-
MMBtu
-
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $6,860 $3,500 - - - $6,860
-
MMBtu
-
TOTAL RECOMMENDED $149,716 $36,970 $136,745
2,480,800
kWh
$24,518
-
kW-mo/yr
$42,857
-
MMBtu
$(-49,351.0)
-
MMBtu
$(-5,053.0)
TOTAL IMPLEMENTED - - - - - - -