Assessment Year | 2022 |
---|---|
Principal Product | Baked Goods and Bread |
NAICS | 311811: Retail Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 135 |
Plant Area |
125,000
ft2
|
Annual Production | 89,271,242
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $662,073 | 9,436,623 |
kWh
|
$0.070 | |
Electricity Demand | $387,920 | 21,966 |
kW-mo/yr
|
$17.66 | |
Electricity Fees | $4,800 | - |
|
- | |
Natural Gas | $680,951 | 80,203 |
MMBtu
|
$8.49 | |
Waste Disposal Costs | |||||
Water Usage | $33,676 | 8,845 |
Tgal
|
$3.81 | |
Water Disposal | $36,523 | 5,307 |
Tgal
|
$6.88 | |
TOTAL YEARLY COSTS | $1,805,943 | ||||
RECOMMENDED SAVINGS* | $36,457 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $14,025 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $10,572 | $40,722 | - | - |
$10,572
-
MMBtu
|
|
02 | 2.7234: Use heat pump for space conditioning | $2,773 | $7,150 |
$2,138
30,556
kWh
|
$635
-
kW-mo/yr
|
- | |
03 | 2.2437: Recover waste heat from equipment | $18,072 | $14,280 |
$(-2,939.0)
(-41,981)
kWh
|
$(-989.0)
-
kW-mo/yr
|
$22,000
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $680 | $750 | - | - |
$680
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,360 | $625 |
$3,248
46,401
kWh
|
$1,112
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $36,457 | $63,527 |
$2,447
34,976
kWh
|
$758
-
kW-mo/yr
|
$33,252
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,025 | $48,622 |
$2,138
30,556
kWh
|
$635
-
kW-mo/yr
|
$11,252
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs