ITAC Assessment: MA0293
ITAC logo
ITAC Assessment: MA0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Turbine Blade and Vane Maint/Coating
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 132,500
ft2
Annual Production 0
units
Production Hrs. Annual 4,992
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $490,274 6,419,988
kWh
Natural Gas $287,830 41,442
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,615

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $100,844 $54,704 - - $100,844
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $21,561 $34,000 $33,973
444,900
kWh
$(-12,412.0)
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $2,149 $644 $2,149
28,136
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $491 $100 $491
8,792
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $1,467 $982 - $1,467
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,209 $334 $1,209
15,826
kWh
- -
07 2.7135: Install occupancy sensors $1,007 $218 $1,007
13,189
kWh
- -
08 2.7221: Lower temperature during the winter season and vice-versa $769 - - $769
-
MMBtu
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $739 - $739
9,672
kWh
- -
10 2.4131: Size electric motors for peak operating efficiency $300 $961 $300
3,517
kWh
- -
TOTAL RECOMMENDED $130,536 $91,943 $39,868
524,032
kWh
$(-10,176.0)
-
MMBtu
$100,844
TOTAL IMPLEMENTED $5,615 $1,726 $3,379
46,600
kWh
$2,236
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs