| Assessment Year | 2014 |
|---|---|
| Principal Product | Jet engine components |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $100 M to 500M |
| # of Employees | 1,291 |
| Plant Area |
876,960
ft2
|
| Annual Production | 1,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,412,448 | 44,844,161 |
kWh
|
$0.076 |
| Electricity Demand | $87,909 | 84,897 |
kW-mo/yr
|
$1.04 |
| Electricity Fees | $28,010 | - |
|
- |
| Natural Gas | $903,036 | 118,795 |
MMBtu
|
$7.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $74,882 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $63,835 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $23,304 | $90,000 |
$23,304
297,642
kWh
|
- | |
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $20,745 | $110,500 |
$20,745
264,944
kWh
|
- | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $16,628 | $5,000 |
$8,413
107,451
kWh
|
$8,215
-
MMBtu
|
|
| 04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $11,047 | $32,000 | - |
$11,047
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,158 | $1,250 |
$3,158
40,331
kWh
|
- | |
| TOTAL RECOMMENDED | $74,882 | $238,750 |
$55,620
710,368
kWh
|
$19,262
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $63,835 | $206,750 |
$55,620
710,368
kWh
|
$8,215
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs