ITAC Assessment: MA0723
ITAC logo
ITAC Assessment: MA0723
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Jet engine components
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $100
M
to 500
M
# of Employees 1,291
Plant Area 876,960
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,412,448 44,844,161
kWh
Electricity Demand $87,909 84,897
kW-mo/yr
Electricity Fees $28,010 -
Natural Gas $903,036 118,795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $23,304 $90,000 $23,304
297,642
kWh
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $20,745 $110,500 $20,745
264,944
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $16,628 $5,000 $8,413
107,451
kWh
$8,215
-
MMBtu
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $11,047 $32,000 - $11,047
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,158 $1,250 $3,158
40,331
kWh
-
TOTAL RECOMMENDED $74,882 $238,750 $55,620
710,368
kWh
$19,262
-
MMBtu
TOTAL IMPLEMENTED $63,835 $206,750 $55,620
710,368
kWh
$8,215
-
MMBtu