ITAC Assessment: UM0177
ITAC logo
ITAC Assessment: UM0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Steel Castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 312
Plant Area 350,000
ft2
Annual Production 14,600
ton
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,596,875 34,081,478
kWh
Electricity Demand $423,835 168,696
kW-mo/yr
Electricity Fees $(-21,278.0) -
Natural Gas $490,821 154,301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,057

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4131: Size electric motors for peak operating efficiency $5,246 $11,850 $5,246
206,331
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,577 $950 $3,841
139,508
kWh
$2,736
-
kW-mo/yr
- -
03 2.7243: Improve air circulation with destratification fans / other methods $12,663 $4,200 - - $12,663
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $12,480 $27,000 - - $12,480
-
MMBtu
-
05 3.5244: Recover metals from casting sand $64,000 - - - - $64,000
-
lb
06 3.5221: Recycle casting sand $48,000 - - - - $48,000
-
lb
07 3.5316: Contract a wood pallet recycling company $14,000 - - - - $14,000
-
lb
TOTAL RECOMMENDED $162,966 $44,000 $9,087
345,839
kWh
$2,736
-
kW-mo/yr
$25,143
-
MMBtu
$126,000
-
lb
TOTAL IMPLEMENTED $81,057 $27,950 $3,841
139,508
kWh
$2,736
-
kW-mo/yr
$12,480
-
MMBtu
$62,000
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs