ITAC Assessment: MA0564
ITAC logo
ITAC Assessment: MA0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Injectiom molding RFID tags
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 43
Plant Area 50,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,274 493,160
kWh
Electricity Demand $11,748 2,238
kW-mo/yr
Electricity Fees $819 -
LPG $19,357 1,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $122

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.2612: Use cooling tower water instead of refrigeration $20,000 - - - $20,000
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,419 $10,531 $3,071
51,100
kWh
$348
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,406 $3,226 $1,406
23,400
kWh
- -
04 2.2511: Insulate bare equipment $168 $75 $168
2,800
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $122 $548 $122
2,033
kWh
- -
TOTAL RECOMMENDED $25,115 $14,380 $4,767
79,333
kWh
$348
-
kW-mo/yr
$20,000
TOTAL IMPLEMENTED $122 $548 $122
2,033
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs