Assessment Year | 2004 |
---|---|
Principal Product | Injectiom molding RFID tags |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 43 |
Plant Area |
50,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,274 | 493,160 |
kWh
|
$0.080 |
Electricity Demand | $11,748 | 2,238 |
kW-mo/yr
|
$5.25 |
Electricity Fees | $819 | - |
|
- |
LPG | $19,357 | 1,380 |
MMBtu
|
$14.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $122 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $20,000 | - | - | - | $20,000 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,419 | $10,531 |
$3,071
51,100
kWh
|
$348
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,406 | $3,226 |
$1,406
23,400
kWh
|
- | - | |
04 | 2.2511: Insulate bare equipment | $168 | $75 |
$168
2,800
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $122 | $548 |
$122
2,033
kWh
|
- | - | |
TOTAL RECOMMENDED | $25,115 | $14,380 |
$4,767
79,333
kWh
|
$348
-
kW-mo/yr
|
$20,000 | ||
TOTAL IMPLEMENTED | $122 | $548 |
$122
2,033
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs