ITAC Assessment: BD0162
ITAC logo
ITAC Assessment: BD0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Paperboard
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 8,712
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,117 13,666,765
kWh
Electricity Demand $214,768 14,618
kW-mo/yr
Electricity Fees $2,236 -
Natural Gas $860,286 329,073
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,249

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 2.2414: Use waste heat from hot flue gases to preheat $10,293 $14,000 - - $10,293
-
MMBtu
- - -
02 2.2437: Recover waste heat from equipment $709 $800 - - $709
-
MMBtu
- - -
03 2.2135: Repair and eliminate steam leaks $270 $150 - - $270
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $247 $172 $175
6,448
kWh
$72
-
kW-mo/yr
- - - -
05 3.3131: Use evaporation to concentrate material $13,419 $10,000 - - - $13,419
-
lb
- -
06 4.447: Automate payroll system $1,560 $2,000 - - - - - $1,560
07 3.5217: Reuse / recycle/ sell paper products $340 $200 - - - - $340 -
TOTAL RECOMMENDED $26,838 $27,322 $175
6,448
kWh
$72
-
kW-mo/yr
$11,272
-
MMBtu
$13,419
-
lb
$340 $1,560
TOTAL IMPLEMENTED $15,249 $12,150 - - $270
-
MMBtu
$13,419
-
lb
- $1,560
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs