ITAC Assessment: MS0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic and Metal Picture Frames
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 251
Plant Area 186,800
ft2
Annual Production 27,600,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $328,995 6,062,134
kWh
Natural Gas $18,881 4,550
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,808 $11,480 $19,808
327,667
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,002 $2,821 $3,002
48,359
kWh
03 2.4221: Install compressor air intakes in coolest locations $1,560 $1,000 $1,560
27,550
kWh
04 2.4133: Use most efficient type of electric motors $4,047 $26,545 $4,047
68,288
kWh
05 2.2511: Insulate bare equipment $2,170 $4,480 $2,170
46,014
kWh
TOTAL RECOMMENDED $30,587 $46,326 $30,587
517,878
kWh
TOTAL IMPLEMENTED $4,562 $3,821 $4,562
75,909
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs