ITAC Assessment: MZ0125
ITAC logo
ITAC Assessment: MZ0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product vehicle frames and body
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 70,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 3,650
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,137 475,840
kWh
Electricity Demand $18,600 1,861
kW-mo/yr
Natural Gas $22,281 2,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $1,108 $480 $1,108
15,384
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,168 $9,300 $3,548
49,275
kWh
$1,620
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,107 $1,300 $758
10,522
kWh
$349
-
kW-mo/yr
TOTAL RECOMMENDED $7,383 $11,080 $5,414
75,181
kWh
$1,969
-
kW-mo/yr
TOTAL IMPLEMENTED $7,383 $11,080 $5,414
75,181
kWh
$1,969
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs