Assessment Year | 1996 |
---|---|
Principal Product | Beverages |
NAICS |
n/a
|
SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
109,850
ft2
|
Annual Production | 4,000,000
units
|
Production Hrs. Annual | 5,720
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,127 | 4,229,191 |
kWh
|
$0.051 |
Electricity Demand | $2,267 | 298 |
kW-mo/yr
|
$7.61 |
Natural Gas | $35,842 | 6,891 |
MMBtu
|
$5.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,950 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,664 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,634 | $200 |
$1,634
31,946
kWh
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $1,257 | $227 |
$924
17,878
kWh
|
$333
-
kW-mo/yr
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,001 | $250 |
$1,544
28,722
kWh
|
$457
-
kW-mo/yr
|
- | - | |
04 | 2.2511: Insulate bare equipment | $7,692 | $5,668 | - | - |
$7,692
-
MMBtu
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $1,337 | $3,292 |
$1,303
25,498
kWh
|
$34
-
kW-mo/yr
|
- | - | |
06 | 3.7221: Improve process control to prevent spills of material | $1,029 | $260 | - | - | - |
$1,029
-
lb
|
|
TOTAL RECOMMENDED | $14,950 | $9,897 |
$5,405
104,044
kWh
|
$824
-
kW-mo/yr
|
$7,692
-
MMBtu
|
$1,029
-
lb
|
||
TOTAL IMPLEMENTED | $12,664 | $9,410 |
$4,481
86,166
kWh
|
$491
-
kW-mo/yr
|
$7,692
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs