Assessment Year | 2004 |
---|---|
Principal Product | Composite decking |
NAICS | 321219: Reconstituted Wood Product Manufacturing |
SIC | 2493: Reconstituted Wood Products |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
40,000
ft2
|
Annual Production | 27,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $159,581 | 2,536,240 |
kWh
|
$0.063 |
Electricity Demand | $40,612 | 4,843 |
kW-mo/yr
|
$8.39 |
Electricity Fees | $781 | - |
|
- |
Natural Gas | $49,700 | 4,625 |
MMBtu
|
$10.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $285,622 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $279,878 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.1191: Change procedures / equipment / operating conditions | $216,000 | $125,000 | - | - | - | $216,000 | |
02 | 4.125: | $57,540 | $40,000 |
$(-2,660.0)
(-35,300)
kWh
|
- | $60,200 | - | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,088 | $8,000 |
$5,088
67,800
kWh
|
- | - | - | |
04 | 2.1224: Replace boiler | $2,760 | $750 | - |
$2,760
-
MMBtu
|
- | - | |
05 | 2.2511: Insulate bare equipment | $2,705 | $754 | - |
$2,705
-
MMBtu
|
- | - | |
06 | 2.2123: Insulate feedwater tank | $873 | $300 | - |
$873
-
MMBtu
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $656 | $548 |
$656
8,709
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $285,622 | $175,352 |
$3,084
41,209
kWh
|
$6,338
-
MMBtu
|
$60,200 | $216,000 | ||
TOTAL IMPLEMENTED | $279,878 | $166,804 |
$(-2,660.0)
(-35,300)
kWh
|
$6,338
-
MMBtu
|
$60,200 | $216,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs