ITAC Assessment: MA0565
ITAC logo
ITAC Assessment: MA0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Composite decking
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 27,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,581 2,536,240
kWh
Electricity Demand $40,612 4,843
kW-mo/yr
Electricity Fees $781 -
Natural Gas $49,700 4,625
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $285,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $279,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 3.1191: Change procedures / equipment / operating conditions $216,000 $125,000 - - - $216,000
02 4.125: $57,540 $40,000 $(-2,660.0)
(-35,300)
kWh
- $60,200 -
03 2.6212: Turn off equipment during breaks, reduce operating time $5,088 $8,000 $5,088
67,800
kWh
- - -
04 2.1224: Replace boiler $2,760 $750 - $2,760
-
MMBtu
- -
05 2.2511: Insulate bare equipment $2,705 $754 - $2,705
-
MMBtu
- -
06 2.2123: Insulate feedwater tank $873 $300 - $873
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $656 $548 $656
8,709
kWh
- - -
TOTAL RECOMMENDED $285,622 $175,352 $3,084
41,209
kWh
$6,338
-
MMBtu
$60,200 $216,000
TOTAL IMPLEMENTED $279,878 $166,804 $(-2,660.0)
(-35,300)
kWh
$6,338
-
MMBtu
$60,200 $216,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs