Assessment Year | 1985 |
---|---|
Principal Product | STAINLESS STEEL FOOD EQUIPMENT |
NAICS |
n/a
|
SIC | 3556: Food Products Machinery |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Wyoming |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $116,220 | 2,961,899 |
kWh
|
$0.039 |
Natural Gas | $75,402 | 21,006 |
MMBtu
|
$3.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,422 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $253 | $250 |
$253
6,448
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $666 | $500 |
$666
16,999
kWh
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $4,591 | $200 | - |
$4,591
-
MMBtu
|
- | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $475 | $534 | - |
$475
-
MMBtu
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,363 | $200 |
$2,363
-
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,589 | $300 | - |
$1,589
-
MMBtu
|
- | |
07 | 2.1222: Install turbulators | $1,268 | $500 | - |
$1,268
-
MMBtu
|
- | |
08 | 2.2437: Recover waste heat from equipment | $1,801 | $1,500 | - |
$1,801
-
MMBtu
|
- | |
09 | 2.2136: Install / repair insulation on steam lines | $555 | $700 | - |
$555
-
MMBtu
|
- | |
10 | 2.2414: Use waste heat from hot flue gases to preheat | $3,094 | $5,000 | - |
$3,094
-
MMBtu
|
- | |
11 | 2.2121: Increase amount of condensate returned | $3,959 | $9,000 | - |
$3,002
-
MMBtu
|
$957 | |
12 | 2.7111: Reduce illumination to minimum necessary levels | $7,066 | $1,000 |
$7,066
180,246
kWh
|
- | - | |
TOTAL RECOMMENDED | $27,680 | $19,684 |
$10,348
203,693
kWh
|
$16,375
-
MMBtu
|
$957 | ||
TOTAL IMPLEMENTED | $20,422 | $12,984 |
$7,985
203,693
kWh
|
$11,480
-
MMBtu
|
$957 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs