ITAC Assessment: IA0104
ITAC logo
ITAC Assessment: IA0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product wood office furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 850
thousand feet
Production Hrs. Annual 4,420
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,308 1,432,298
kWh
Natural Gas $38,820 8,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,966

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,485 $540 $3,485
59,203
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $656 $25 $656
11,137
kWh
-
03 2.6218: Turn off equipment when not in use $2,691 $700 - $2,691
-
MMBtu
04 2.7135: Install occupancy sensors $134 $343 $134
2,345
kWh
-
TOTAL RECOMMENDED $6,966 $1,608 $4,275
72,685
kWh
$2,691
-
MMBtu
TOTAL IMPLEMENTED $6,966 $1,608 $4,275
72,685
kWh
$2,691
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs