| Assessment Year | 1999 |
|---|---|
| Principal Product | Plastic Products |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
300,000
ft2
|
| Annual Production | 16,000,000
lb
|
| Production Hrs. Annual | 8,232
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $493,800 | 7,566,823 |
kWh
|
$0.065 |
| Electricity Demand | $159,832 | 17,006 |
kW-mo/yr
|
$9.40 |
| Electricity Fees | $4,101 | - |
|
- |
| Natural Gas | $18,172 | 5,898 |
MMBtu
|
$3.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $67,320 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,624 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,715 | $15,311 |
$7,798
119,578
kWh
|
$1,917
-
kW-mo/yr
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $9,478 | $39,600 |
$9,478
145,076
kWh
|
- | - | |
| 03 | 4.652: Replace existing equipment with more suitable substitutes | $39,503 | $85,000 |
$39,503
605,217
kWh
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,524 | $2,500 |
$6,219
95,252
kWh
|
$1,305
-
kW-mo/yr
|
- | |
| 05 | 3.1191: Change procedures / equipment / operating conditions | $1,100 | $360 | - | - | $1,100 | |
| TOTAL RECOMMENDED | $67,320 | $142,771 |
$62,998
965,123
kWh
|
$3,222
-
kW-mo/yr
|
$1,100 | ||
| TOTAL IMPLEMENTED | $8,624 | $2,860 |
$6,219
95,252
kWh
|
$1,305
-
kW-mo/yr
|
$1,100 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs