ITAC Assessment: HO0190
ITAC logo
ITAC Assessment: HO0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 300,000
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 8,232
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $493,800 7,566,823
kWh
Electricity Demand $159,832 17,006
kW-mo/yr
Electricity Fees $4,101 -
Natural Gas $18,172 5,898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,624

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,715 $15,311 $7,798
119,578
kWh
$1,917
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $9,478 $39,600 $9,478
145,076
kWh
- -
03 4.652: Replace existing equipment with more suitable substitutes $39,503 $85,000 $39,503
605,217
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,524 $2,500 $6,219
95,252
kWh
$1,305
-
kW-mo/yr
-
05 3.1191: Change procedures / equipment / operating conditions $1,100 $360 - - $1,100
TOTAL RECOMMENDED $67,320 $142,771 $62,998
965,123
kWh
$3,222
-
kW-mo/yr
$1,100
TOTAL IMPLEMENTED $8,624 $2,860 $6,219
95,252
kWh
$1,305
-
kW-mo/yr
$1,100
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs