1,768
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0808 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,145 | $32,578 | |
| OR0808 #04 Y:2025 | 04 | 2025 | Reduce illumination to minimum necessary levels | $3,076 | - | |
| OR0808 #03 Y:2025 | 03 | 2025 | Reduce ventilation air | $6,836 | - | |
| OR0808 #02 Y:2025 | 02 | 2025 | Use cooling tower or economizer to replace chiller cooling | $8,055 | - | |
| OR0808 #01 Y:2025 | 01 | 2025 | Reduce ventilation air | $13,430 | - | |
| OR0807 #02 Y:2025 | 02 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,721 | $7,534 | |
| OR0807 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $8,168 | $10,530 | |
| ORC017 #04 Y:2025 | 04 | 2025 | Reduce ventilation air | $742 | $5,000 | |
| ORC017 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $52 | $250 | |
| OR0805 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $103,946 | $1,750,000 | |
| OR0805 #05 Y:2025 | 05 | 2025 | Regrind, reuse, or sell scrap plastic parts | $5,605 | - | |
| OR0805 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,651 | - | |
| OR0805 #03 Y:2025 | 03 | 2025 | Turn off equipment during breaks, reduce operating time | $928 | - | |
| OR0805 #02 Y:2025 | 02 | 2025 | Minimize operation of equipment maintained in standby condition | $2,187 | - | |
| OR0805 #01 Y:2025 | 01 | 2025 | Eliminate or reduce compressed air usage | $26,892 | - | |
| ORC016 #02 Y:2025 | 02 | 2025 | Repair or replace steam traps | $14,324 | $1,894 | |
| ORC016 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $6,757 | $18,123 | |
| OR0804 #06 Y:2024 | 06 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $634 | - | |
| OR0804 #05 Y:2024 | 05 | 2024 | Insulate bare equipment | $4,359 | $4,063 | |
| OR0804 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $27,473 | $22,751 |