ITAC Assessment: OR0798
ITAC logo
ITAC Assessment: OR0798
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Manufactured Homes
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 180,000
ft2
Annual Production 633
units
Production Hrs. Annual 2,167
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,213 959,978
kWh
Electricity Demand $57,510 3,847
kW-mo/yr
Electricity Fees $14,999 -
Natural Gas $74,745 6,746
MMBtu
TOTAL YEARLY COSTS $217,467
RECOMMENDED SAVINGS* $44,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $1,715 $502 - - $1,715
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $733 $2,196 - - $733
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,382 $4,736 $369
5,039
kWh
$1,013
-
kW-mo/yr
-
04 2.4321: Upgrade obsolete equipment $19,584 $93,860 $11,487
157,058
kWh
$8,097
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $13,899 $90,000 $8,732
119,389
kWh
$5,167
-
kW-mo/yr
-
06 2.7231: Use radiant heater for spot heating $921 $8,538 - - $921
-
MMBtu
07 2.4322: Use or replace with energy efficient substitutes $6,445 $64,276 $5,950
81,348
kWh
$495
-
kW-mo/yr
-
TOTAL RECOMMENDED $44,679 $264,108 $26,538
362,834
kWh
$14,772
-
kW-mo/yr
$3,369
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs