Plant Area |
168,000
ft2
|
Annual Production | 880
units
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,391 | 720,914 |
kWh
|
$0.067 |
Electricity Demand | $40,784 | 2,992 |
kW-mo/yr
|
$13.63 |
Electricity Fees | $5,097 | - |
|
- |
Natural Gas | $19,906 | 1,856 |
MMBtu
|
$10.73 |
LPG | $14,463 | 621 |
MMBtu
|
$23.28 |
TOTAL YEARLY COSTS | $128,641 | |||
RECOMMENDED SAVINGS* | $51,372 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $1,236 | $1,629 | - | - |
$1,236
-
MMBtu
|
- | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $2,287 | $5,523 |
$2,287
34,077
kWh
|
- | - | - | - | - | |
03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $20,545 | $92,473 |
$(-9,181.0)
(-136,782)
kWh
|
- | - |
$14,463
-
MMBtu
|
$12,590 | $2,673 | |
04 | 2.9114: Use solar heat to make electricty | $12,662 | $67,250 |
$8,246
122,809
kWh
|
$4,416
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,153 | $7,546 |
$1,153
17,180
kWh
|
- | - | - | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $13,489 | $12,623 |
$6,898
102,765
kWh
|
$6,591
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $51,372 | $187,044 |
$9,403
140,049
kWh
|
$11,007
-
kW-mo/yr
|
$1,236
-
MMBtu
|
$14,463
-
MMBtu
|
$12,590 | $2,673 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs