ITAC Assessment: OR0804
ITAC logo
ITAC Assessment: OR0804
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Gift baskets, food gifts
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range greater than $500
M
# of Employees 1,231
Plant Area 1,000,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,888
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,252,675 21,314,360
kWh
Electricity Demand $418,949 41,951
kW-mo/yr
Electricity Fees $102,148 -
Natural Gas $82,979 24,029
MMBtu
Waste Disposal Costs
Water Usage $66,903 27,865
Tgal
TOTAL YEARLY COSTS $1,923,654
RECOMMENDED SAVINGS* $517,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,473 $22,751 $16,404
279,124
kWh
$11,069
-
kW-mo/yr
- - -
02 2.8226: Increase efficiency of trucks $473,339 $1,593,482 $(-100,005.0)
(-1,701,630)
kWh
- - $370,220
-
MMBtu
$203,124
03 2.1233: Analyze flue gas for proper air/fuel ratio $5,461 - - - $5,461
-
MMBtu
- -
04 2.4322: Use or replace with energy efficient substitutes $8,678 $51,877 $8,678
147,652
kWh
- - - -
05 2.2511: Insulate bare equipment $1,439 $4,063 - - $1,439
-
MMBtu
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $634 - $400
6,798
kWh
$234
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $517,024 $1,672,173 $(-74,523.0)
(-1,268,056)
kWh
$11,303
-
kW-mo/yr
$6,900
-
MMBtu
$370,220
-
MMBtu
$203,124
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs