ITAC Assessment: OR0797
ITAC logo
ITAC Assessment: OR0797
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 7
Plant Area 1,608,337
ft2
Annual Production 839,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,261 1,004,378
kWh
Electricity Demand $20,547 2,764
kW-mo/yr
Electricity Fees $10,483 -
Natural Gas $33,857 3,100
MMBtu
Waste Disposal Costs
Water Usage $1 839,500
Tgal
TOTAL YEARLY COSTS $149,149
RECOMMENDED SAVINGS* $66,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.3322: Use existing dam to generate electricity $4,211 $17,825 $4,211
62,016
kWh
- - -
02 2.2443: Re-use or recycle hot or cold process exhaust air $2,639 $227 $2,639
31,454
kWh
- - -
03 4.463: Modify facility to avoid excess maintenance costs $7,711 $22,822 $191
2,282
kWh
- $3,200 $4,320
04 3.1191: Change procedures / equipment / operating conditions $3,405 $16,073 $3,066
36,551
kWh
$339
-
kW-mo/yr
- -
05 2.9121: Install wind powered electric generator $5,114 $43,821 $4,561
54,372
kWh
$553
-
kW-mo/yr
- -
06 2.9114: Use solar heat to make electricty $43,815 $607,740 $37,841
451,033
kWh
$5,974
-
kW-mo/yr
- -
TOTAL RECOMMENDED $66,895 $708,508 $52,509
637,708
kWh
$6,866
-
kW-mo/yr
$3,200 $4,320
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs