Assessment Year | 2012 |
---|---|
Principal Product | gas fireplace logs |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $5 M to 10M |
# of Employees | 154 |
Plant Area |
117,285
ft2
|
Annual Production | 800,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,115 | 1,586,560 |
kWh
|
$0.035 |
Electricity Demand | $78,565 | 6,641 |
kW-mo/yr
|
$11.83 |
Electricity Fees | $25,502 | - |
|
- |
Natural Gas | $103,681 | 16,908 |
MMBtu
|
$6.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,211 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,294 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $16,324 | - | - | - | $16,324 | - | |
02 | 2.3212: Optimize plant power factor | $14,754 | $11,220 | - | - | $14,754 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,410 | $26,824 |
$1,295
36,590
kWh
|
$2,212
-
kW-mo/yr
|
$3,903 | - | |
04 | 2.4224: Upgrade controls on compressors | $4,375 | $10,500 |
$767
21,670
kWh
|
$3,608
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $460 | $756 |
$460
13,004
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $350 | $500 |
$350
9,880
kWh
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $343 | $269 |
$343
9,693
kWh
|
- | - | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $654 | $337 |
$654
18,483
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $316 | $327 |
$23
662
kWh
|
$11
-
kW-mo/yr
|
$282 | - | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $49,180 | $6,650 | - | - | - |
$49,180
-
MMBtu
|
|
11 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $3,482 | $988 | - | - | - |
$3,482
-
MMBtu
|
|
12 | 2.2437: Recover waste heat from equipment | $1,563 | $4,550 | - | - | - |
$1,563
-
MMBtu
|
|
TOTAL RECOMMENDED | $99,211 | $62,921 |
$3,892
109,982
kWh
|
$5,831
-
kW-mo/yr
|
$35,263 |
$54,225
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,294 | $31,980 |
$2,292
64,766
kWh
|
$2,212
-
kW-mo/yr
|
$20,227 |
$1,563
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs