Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

295

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0264 #11 Y:2024 Replace fossil fuel equipment with electrical equipment $44,506 $432,000
UU0264 #10 Y:2024 Utilize energy-efficient belts and other improved mechanisms $515 $916
UU0264 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,405 $8,915
UU0264 #06 Y:2024 Eliminate or reduce compressed air usage $1,905 $7,317
UU0264 #05 Y:2024 Upgrade controls on compressors $3,332 $4,000
UU0264 #04 Y:2024 Replace boiler $379,077 $4,080,441
UU0264 #03 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $729,671 $3,645,455
UU0264 #02 Y:2024 Preheat boiler makeup water with waste process heat $215,672 $730,950
UU0252 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,070 $4,410
UU0252 #03 Y:2024 Use solar heat to make electricty $1,880 $5,500
UU0252 #02 Y:2024 Use small number of high output units instead of many small inefficient units $53,389 $212,000
UU0252 #01 Y:2024 Use small number of high output units instead of many small inefficient units $19,754 $108,000
UU0248 #06 Y:2024 Use or replace with energy efficient substitutes $940 $3,000
UU0248 #04 Y:2024 Add equipment/ operators to reduce production bottleneck $33,420 $319,250
UU0248 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,740 $1,270
UU0248 #01 Y:2024 Install compressor air intakes in coolest locations $980 $2,600
UU0247 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $864 $7,540
UU0247 #04 Y:2024 Use waste heat from hot flue gases to preheat incoming fluids $1,060 $1,950
UU0247 #01 Y:2024 Turn off equipment when not in use $5,970 $3,000
UU0235 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,664 $1,013