295
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0264 #11 Y:2024 | 11 | 2024 | Replace fossil fuel equipment with electrical equipment | $44,506 | $432,000 | |
UU0264 #10 Y:2024 | 10 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $515 | $916 | |
UU0264 #07 Y:2024 | 07 | 2024 | Utilize higher efficiency lamps and/or ballasts | $4,405 | $8,915 | |
UU0264 #06 Y:2024 | 06 | 2024 | Eliminate or reduce compressed air usage | $1,905 | $7,317 | |
UU0264 #05 Y:2024 | 05 | 2024 | Upgrade controls on compressors | $3,332 | $4,000 | |
UU0264 #04 Y:2024 | 04 | 2024 | Replace boiler | $379,077 | $4,080,441 | |
UU0264 #03 Y:2024 | 03 | 2024 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $729,671 | $3,645,455 | |
UU0264 #02 Y:2024 | 02 | 2024 | Preheat boiler makeup water with waste process heat | $215,672 | $730,950 | |
UU0252 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,070 | $4,410 | |
UU0252 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $1,880 | $5,500 | |
UU0252 #02 Y:2024 | 02 | 2024 | Use small number of high output units instead of many small inefficient units | $53,389 | $212,000 | |
UU0252 #01 Y:2024 | 01 | 2024 | Use small number of high output units instead of many small inefficient units | $19,754 | $108,000 | |
UU0248 #06 Y:2024 | 06 | 2024 | Use or replace with energy efficient substitutes | $940 | $3,000 | |
UU0248 #04 Y:2024 | 04 | 2024 | Add equipment/ operators to reduce production bottleneck | $33,420 | $319,250 | |
UU0248 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,740 | $1,270 | |
UU0248 #01 Y:2024 | 01 | 2024 | Install compressor air intakes in coolest locations | $980 | $2,600 | |
UU0247 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $864 | $7,540 | |
UU0247 #04 Y:2024 | 04 | 2024 | Use waste heat from hot flue gases to preheat incoming fluids | $1,060 | $1,950 | |
UU0247 #01 Y:2024 | 01 | 2024 | Turn off equipment when not in use | $5,970 | $3,000 | |
UU0235 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,664 | $1,013 |