ITAC Assessment: UW2309
ITAC logo
ITAC Assessment: UW2309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Fiberglass Reinforced Plastics/Bathware
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 106,000
ft2
Annual Production 15,000
units
Production Hrs. Annual 3,540
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,471 1,164,999
kWh
Electricity Demand $19,521 8,250
kW-mo/yr
Electricity Fees $20,549 -
Natural Gas $99,663 13,673
MMBtu
TOTAL YEARLY COSTS $195,204
RECOMMENDED SAVINGS* $14,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,588

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $5,420 $4,240 $4,993
104,888
kWh
$427
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,363 - $2,216
45,287
kWh
$147
-
kW-mo/yr
03 2.4226: Use / purchase optimum sized compressor $6,805 - $6,371
133,844
kWh
$434
-
kW-mo/yr
TOTAL RECOMMENDED $14,588 $4,240 $13,580
284,019
kWh
$1,008
-
kW-mo/yr
TOTAL IMPLEMENTED $14,588 $4,240 $13,580
284,019
kWh
$1,008
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs