Assessment Year 2020
Principal Product Commercial faucets & fixtures
NAICS 332913: Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $100
M
to 500
M
# of Employees 320
Plant Area 215,500
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,700
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,080 3,062,210
kWh
Electricity Demand $85,949 8,924
kW-mo/yr
Electricity Fees $14,668 -
Natural Gas $49,535 6,789
MMBtu
Waste Disposal Costs
Water Usage $14,109 5,517
Tgal
Water Disposal $21,148 5,517
Tgal
TOTAL YEARLY COSTS $312,489
RECOMMENDED SAVINGS* $19,358 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,388 $1,300 $3,385
81,573
kWh
$2,003
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,350 $1,650 $3,192
76,927
kWh
$158
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,213 - $542
13,061
kWh
$671
-
kW-mo/yr
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $9,407 $23,157 $5,845
140,851
kWh
$3,562
-
kW-mo/yr
TOTAL RECOMMENDED $19,358 $26,107 $12,964
312,412
kWh
$6,394
-
kW-mo/yr
TOTAL IMPLEMENTED $18,145 $26,107 $12,422
299,351
kWh
$5,723
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs