| Assessment Year | 2020 |
|---|---|
| Principal Product | Commercial faucets & fixtures |
| NAICS | 332913: Plumbing Fixture Fitting and Trim Manufacturing |
| SIC | 3432: Plumbing Fixture Fittings and Trim |
| Sales Range | $100 M to 500M |
| # of Employees | 320 |
| Plant Area |
215,500
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 4,700
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $127,080 | 3,062,210 |
kWh
|
$0.041 | |
| Electricity Demand | $85,949 | 8,924 |
kW-mo/yr
|
$9.63 | |
| Electricity Fees | $14,668 | - |
|
- | |
| Natural Gas | $49,535 | 6,789 |
MMBtu
|
$7.30 | |
| Waste Disposal Costs | |||||
| Water Usage | $14,109 | 5,517 |
Tgal
|
$2.56 | |
| Water Disposal | $21,148 | 5,517 |
Tgal
|
$3.83 | |
| TOTAL YEARLY COSTS | $312,489 | ||||
| RECOMMENDED SAVINGS* | $19,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $18,145 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,388 | $1,300 |
$3,385
81,573
kWh
|
$2,003
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,350 | $1,650 |
$3,192
76,927
kWh
|
$158
-
kW-mo/yr
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,213 | - |
$542
13,061
kWh
|
$671
-
kW-mo/yr
|
|
| 04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $9,407 | $23,157 |
$5,845
140,851
kWh
|
$3,562
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $19,358 | $26,107 |
$12,964
312,412
kWh
|
$6,394
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $18,145 | $26,107 |
$12,422
299,351
kWh
|
$5,723
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs