ITAC Assessment: UU0225
ITAC logo
ITAC Assessment: UU0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Retail Bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 165
Plant Area 221,000
ft2
Annual Production 10,100,000
pieces
Production Hrs. Annual 8,712
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,531,756 29,434,920
kWh
Electricity Demand $294,979 45,528
kW-mo/yr
Electricity Fees $115,998 -
TOTAL YEARLY COSTS $1,942,733
RECOMMENDED SAVINGS* $88,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4226: Use / purchase optimum sized compressor $39,842 $126,388 $32,643
627,750
kWh
$7,199
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $28,874 - $24,645
473,933
kWh
$4,230
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,047 $11,922 $8,577
164,950
kWh
$1,469
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,399 $15,200 $5,257
101,092
kWh
$1,142
-
kW-mo/yr
05 2.4322: Use or replace with energy efficient substitutes $2,851 $2,775 $2,851
54,823
kWh
-
TOTAL RECOMMENDED $88,013 $156,286 $73,972
1,422,548
kWh
$14,040
-
kW-mo/yr
TOTAL IMPLEMENTED $88,013 $156,286 $73,972
1,422,548
kWh
$14,040
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs