ITAC Assessment: UU0248
ITAC logo
ITAC Assessment: UU0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Agricultural Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 35,147
ft2
Annual Production 278
units
Production Hrs. Annual 2,739
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,822 234,126
kWh
Electricity Demand $5,404 1,081
kW-mo/yr
Electricity Fees $40 -
Natural Gas $10,054 1,292
MMBtu
LPG $7,426 114
MMBtu
Fuel Oil #2 $16,025 433
MMBtu
Fuel Oil #4 $55,580 2,387
MMBtu
TOTAL YEARLY COSTS $105,351
RECOMMENDED SAVINGS* $45,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #4 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $980 $2,600 $836
17,940
kWh
$144
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,740 $1,270 $1,715
37,080
kWh
$25
-
kW-mo/yr
- - - -
03 3.1194: Use automatic flow control $820 $4,250 $694
15,090
kWh
$126
-
kW-mo/yr
- - - -
04 4.111: Add equipment/ operators to reduce production bottleneck $33,420 $319,250 $(-620.0)
(-13,440)
kWh
- $2,480
-
MMBtu
$26,870
-
MMBtu
$4,690 -
05 2.1321: Replace fossil fuel equipment with electrical equipment $6,380 $133,800 $(-1,050.0)
(-22,770)
kWh
- $7,430
-
MMBtu
- - -
06 2.4322: Use or replace with energy efficient substitutes $940 $3,000 - - - - - $940
07 2.4322: Use or replace with energy efficient substitutes $1,570 $9,360 $1,570
34,320
kWh
- - - - -
TOTAL RECOMMENDED $45,850 $473,530 $3,145
68,220
kWh
$295
-
kW-mo/yr
$9,910
-
MMBtu
$26,870
-
MMBtu
$4,690 $940
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #4 Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs