Assessment Year | 1998 |
---|---|
Principal Product | Steel Replacement Parts |
NAICS |
n/a
|
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
4,000,000
ft2
|
Annual Production | 33,911
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,167,072 | 35,057,445 |
kWh
|
$0.033 |
Electricity Demand | $433,640 | 130,395 |
kW-mo/yr
|
$3.33 |
Electricity Fees | $35,153 | - |
|
- |
Natural Gas | $582,002 | 189,766 |
MMBtu
|
$3.07 |
LPG | $30,763 | 4,114 |
MMBtu
|
$7.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,473,032 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,379,181 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,374,400 | $105,000 |
$(-18,600.0)
(-558,910)
kWh
|
$(-3,000.0)
-
kW-mo/yr
|
- | - | - | $1,396,000 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,781 | $1,000 |
$4,267
128,077
kWh
|
$514
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $78,861 | $26,602 | - | - |
$78,861
-
MMBtu
|
- | - | - | |
04 | 2.1332: Convert combustion equipment to burn natural gas | $14,990 | $79,750 |
$(-560.0)
(-16,706)
kWh
|
- |
$(-10,270.0)
-
MMBtu
|
$30,760
-
MMBtu
|
$(-4,940.0) | - | |
05 | 2.3212: Optimize plant power factor | - | $136,000 | - | - | - | - | - | - | |
TOTAL RECOMMENDED | $1,473,032 | $348,352 |
$(-14,893.0)
(-447,539)
kWh
|
$(-2,486.0)
-
kW-mo/yr
|
$68,591
-
MMBtu
|
$30,760
-
MMBtu
|
$(-4,940.0) | $1,396,000 | ||
TOTAL IMPLEMENTED | $1,379,181 | $106,000 |
$(-14,333.0)
(-430,833)
kWh
|
$(-2,486.0)
-
kW-mo/yr
|
- | - | - | $1,396,000 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs