ITAC Assessment: UU0235
ITAC logo
ITAC Assessment: UU0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Sugar
NAICS 311313: Beet Sugar Manufacturing
SIC 2063: Beet Sugar
Sales Range $100
M
to 500
M
# of Employees 425
Plant Area 400,000
ft2
Annual Production 412,500
ton
Production Hrs. Annual 7,920
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,495 5,249,877
kWh
Electricity Demand $74,931 11,845
kW-mo/yr
Electricity Fees $102,752 -
Natural Gas $3,022,758 661,579
MMBtu
TOTAL YEARLY COSTS $3,399,936
RECOMMENDED SAVINGS* $292,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,664 $1,013 $1,534
40,361
kWh
$131
-
kW-mo/yr
-
02 2.1393: Use steam sparging or injections in place of indirect heating $271,861 $3,050,000 $14,290
376,046
kWh
$3,302
-
kW-mo/yr
$254,269
-
MMBtu
03 2.2511: Insulate bare equipment $12,478 $23,282 - - $12,478
-
MMBtu
04 2.2515: Use optimum thickness insulation $6,968 $8,826 - - $6,968
-
MMBtu
TOTAL RECOMMENDED $292,971 $3,083,121 $15,823
416,407
kWh
$3,433
-
kW-mo/yr
$273,715
-
MMBtu
TOTAL IMPLEMENTED $1,664 $1,013 $1,534
40,361
kWh
$131
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs