ITAC Assessment: KU0310
ITAC logo
ITAC Assessment: KU0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PLASTIC AUTO. LENSES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 4,800,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,286 4,594,080
kWh
Natural Gas $4,994 1,190
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,155 $4,288 $4,155
61,254
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,513 $280 $3,513
51,876
kWh
-
03 2.2621: Modify refrigeration system to operate at a lower pressure $12,188 $18,000 $12,188
179,953
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $734 - $734
10,844
kWh
-
05 2.3191: Use demand controller or load shedder $8,069 $1,000 $8,069
-
kWh
-
06 2.6121: Reduce hot water temperature to the minimum required $496 - $496
7,327
kWh
-
07 2.8112: Combine utility meters $230 $150 - $230
-
MMBtu
TOTAL RECOMMENDED $29,385 $23,718 $29,155
311,254
kWh
$230
-
MMBtu
TOTAL IMPLEMENTED $16,233 $5,568 $16,233
120,457
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs