ITAC Assessment: MZ0035
ITAC logo
ITAC Assessment: MZ0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Sausages and other meat products
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 211
Plant Area 111,350
ft2
Annual Production 31,200,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,191 4,740,559
kWh
Natural Gas $319,954 35,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,568 - $1,568
31,574
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $567 $775 $567
10,950
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,477 $900 $1,137
22,733
kWh
$340
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $568 $358 $568
11,310
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,887 $900 $1,887
36,383
kWh
- -
06 2.2437: Recover waste heat from equipment $9,395 $1,500 - - $9,395
-
MMBtu
TOTAL RECOMMENDED $15,462 $4,433 $5,727
112,950
kWh
$340
-
kW-mo/yr
$9,395
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs