ITAC Assessment: MZ0268
ITAC logo
ITAC Assessment: MZ0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product injectable animal vaccines
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $100
M
to 500
M
# of Employees 375
Plant Area 301,378
ft2
Annual Production 90,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,930,696 36,036,006
kWh
Electricity Demand $689,374 76,737
kW-mo/yr
Natural Gas $411,897 139,864
MMBtu
Waste Disposal Costs
Water Usage $451,007 84,236,020
Tgal
Water Disposal $627,712 84,236
Tgal
TOTAL YEARLY COSTS $4,110,686
RECOMMENDED SAVINGS* $515,044 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $508,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $743 - $605
11,213
kWh
$138
-
kW-mo/yr
- - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,263 $720 - - $4,263
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $102,897 $152,035 $70,915
1,313,246
kWh
$16,155
-
kW-mo/yr
- - - $15,827
04 2.7135: Install occupancy sensors $25,560 $24,500 $25,560
473,336
kWh
- - - - -
05 2.3212: Optimize plant power factor $1,207 $3,830 - $1,207
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $4,884 $10,920 $3,896
72,148
kWh
$988
-
kW-mo/yr
- - - -
07 3.4111: Use closed cycle process to minimize waste water production $375,490 $148,000 $(-1,131.0)
(-20,935)
kWh
$(-313.0)
-
kW-mo/yr
- $157,594
-
Tgal
$219,340
-
Tgal
-
TOTAL RECOMMENDED $515,044 $340,005 $99,845
1,849,008
kWh
$18,175
-
kW-mo/yr
$4,263
-
MMBtu
$157,594
-
Tgal
$219,340
-
Tgal
$15,827
TOTAL IMPLEMENTED $508,210 $325,255 $95,344
1,765,647
kWh
$15,842
-
kW-mo/yr
$4,263
-
MMBtu
$157,594
-
Tgal
$219,340
-
Tgal
$15,827
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs