ITAC Assessment: NC0205
ITAC logo
ITAC Assessment: NC0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Denim weaving
NAICS
n/a
SIC 2210:
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 250,000
ft2
Annual Production 1,300
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $515,447 17,186,694
kWh
Electricity Demand $240,016 29,725
kW-mo/yr
Electricity Fees $31,379 -
Natural Gas $378,143 86,426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,364 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $6,613 $1,000 n/a $2,665
88,804
kWh
$3,948
-
kW-mo/yr
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $7,579 $20,000 n/a $4,135
137,749
kWh
$3,444
-
kW-mo/yr
- - - - -
03 2.7241: Install outside air damper / economizer on hvac unit $15,232 $20,000 n/a $15,232
507,913
kWh
- - - - - -
04 4.641: Eliminate shutdowns of controls due to overheating $11,092 $16,250 n/a $339
11,430
kWh
$501
-
kW-mo/yr
- $(-243.0)
-
Tgal
- - $10,495
05 2.1133: Adjust burners for efficient operation $10,548 $2,000 n/a - - $10,548
-
MMBtu
- - - -
06 4.611: Begin a practice of predictive / preventative maintenance $15,300 $200 n/a - - - - $15,000 $300 -
TOTAL RECOMMENDED $66,364 $59,450 $22,371
745,896
kWh
$7,893
-
kW-mo/yr
$10,548
-
MMBtu
$(-243.0)
-
Tgal
$15,000 $300 $10,495
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs