Assessment Year | 1991 |
---|---|
Principal Product | STAINLESS STEEL EQUIPMENT |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 3,355
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,106 | 1,177,608 |
kWh
|
$0.057 |
Natural Gas | $60,331 | 13,616 |
MMBtu
|
$4.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,435 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.4151: Minimize water usage | $4,600 | - | - | - | $4,600 | |
02 | 2.4133: Use most efficient type of electric motors | $726 | $600 |
$726
10,844
kWh
|
- | - | |
03 | 2.8112: Combine utility meters | $2,430 | $250 | - |
$2,430
-
MMBtu
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $394 | $507 |
$394
4,982
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,670 | $6,300 |
$1,670
35,756
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,055 | $1,030 |
$1,055
16,706
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $990 | $250 |
$990
37,222
kWh
|
- | - | |
08 | 2.4312: Improve lubrication practices | $590 | - |
$590
12,603
kWh
|
- | - | |
09 | 2.2437: Recover waste heat from equipment | $580 | $200 | - |
$580
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $13,035 | $9,137 |
$5,425
118,113
kWh
|
$3,010
-
MMBtu
|
$4,600 | ||
TOTAL IMPLEMENTED | $8,435 | $9,137 |
$5,425
118,113
kWh
|
$3,010
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs