ITAC Assessment: AM0118
ITAC logo
ITAC Assessment: AM0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STAINLESS STEEL EQUIPMENT
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 13,000,000
lb
Production Hrs. Annual 3,355
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,106 1,177,608
kWh
Natural Gas $60,331 13,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4151: Minimize water usage $4,600 - - - $4,600
02 2.4133: Use most efficient type of electric motors $726 $600 $726
10,844
kWh
- -
03 2.8112: Combine utility meters $2,430 $250 - $2,430
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $394 $507 $394
4,982
kWh
- -
05 2.4133: Use most efficient type of electric motors $1,670 $6,300 $1,670
35,756
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,055 $1,030 $1,055
16,706
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $990 $250 $990
37,222
kWh
- -
08 2.4312: Improve lubrication practices $590 - $590
12,603
kWh
- -
09 2.2437: Recover waste heat from equipment $580 $200 - $580
-
MMBtu
-
TOTAL RECOMMENDED $13,035 $9,137 $5,425
118,113
kWh
$3,010
-
MMBtu
$4,600
TOTAL IMPLEMENTED $8,435 $9,137 $5,425
118,113
kWh
$3,010
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs