ITAC Assessment: UU0247
ITAC logo
ITAC Assessment: UU0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Truck and Trailer Rebuilds
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 46,820
ft2
Annual Production 125
units
Production Hrs. Annual 2,241
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,895 328,442
kWh
Electricity Demand $9,098 1,820
kW-mo/yr
Natural Gas $19,247 2,475
MMBtu
Fuel Oil #1 $52,408 1,123
MMBtu
Fuel Oil #2 $6,471 1,956
MMBtu
Other Energy $1,230 1
MMBtu
TOTAL YEARLY COSTS $103,349
RECOMMENDED SAVINGS* $209,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,894

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.6218: Turn off equipment when not in use $5,970 $3,000 $5,970
131,510
kWh
- - -
02 2.2437: Recover waste heat from equipment $1,770 $9,500 - - $1,770
-
MMBtu
-
03 2.4323: Use optimum size and capacity equipment $200,000 $717,040 - - - $200,000
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $1,060 $1,950 - - $1,060
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $864 $7,540 $575
12,730
kWh
$289
-
kW-mo/yr
- -
TOTAL RECOMMENDED $209,664 $739,030 $6,545
144,240
kWh
$289
-
kW-mo/yr
$2,830
-
MMBtu
$200,000
TOTAL IMPLEMENTED $7,894 $12,490 $6,545
144,240
kWh
$289
-
kW-mo/yr
$1,060
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs