Assessment Year | 2024 |
---|---|
Principal Product | Truck and Trailer Rebuilds |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $1 M to 5M |
# of Employees | 22 |
Plant Area |
46,820
ft2
|
Annual Production | 125
units
|
Production Hrs. Annual | 2,241
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $14,895 | 328,442 |
kWh
|
$0.045 |
Electricity Demand | $9,098 | 1,820 |
kW-mo/yr
|
$5.00 |
Natural Gas | $19,247 | 2,475 |
MMBtu
|
$7.78 |
Fuel Oil #1 | $52,408 | 1,123 |
MMBtu
|
$46.67 |
Fuel Oil #2 | $6,471 | 1,956 |
MMBtu
|
$3.31 |
Other Energy | $1,230 | 1 |
MMBtu
|
$1,230.00 |
TOTAL YEARLY COSTS | $103,349 | |||
RECOMMENDED SAVINGS* | $209,664 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,894 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $5,970 | $3,000 |
$5,970
131,510
kWh
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $1,770 | $9,500 | - | - |
$1,770
-
MMBtu
|
- | |
03 | 2.4323: Use optimum size and capacity equipment | $200,000 | $717,040 | - | - | - | $200,000 | |
04 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $1,060 | $1,950 | - | - |
$1,060
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $864 | $7,540 |
$575
12,730
kWh
|
$289
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $209,664 | $739,030 |
$6,545
144,240
kWh
|
$289
-
kW-mo/yr
|
$2,830
-
MMBtu
|
$200,000 | ||
TOTAL IMPLEMENTED | $7,894 | $12,490 |
$6,545
144,240
kWh
|
$289
-
kW-mo/yr
|
$1,060
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs