ITAC Assessment: UU0236
ITAC logo
ITAC Assessment: UU0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Potato Flakes
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 55,000
ft2
Annual Production 30,400,000
lb
Production Hrs. Annual 7,680
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,768 3,519,701
kWh
Electricity Demand $33,379 7,042
kW-mo/yr
Natural Gas $1,446,365 302,113
MMBtu
TOTAL YEARLY COSTS $1,653,512
RECOMMENDED SAVINGS* $302,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $302,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.1224: Replace boiler $208,300 $1,070,720 $208,300
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $72,320 $46,000 $72,320
-
MMBtu
03 2.2511: Insulate bare equipment $16,698 $11,570 $16,698
-
MMBtu
04 2.2511: Insulate bare equipment $5,640 $3,090 $5,640
-
MMBtu
TOTAL RECOMMENDED $302,958 $1,131,380 $302,958
-
MMBtu
TOTAL IMPLEMENTED $302,958 $1,131,380 $302,958
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs