Assessment Year | 2024 |
---|---|
Principal Product | Potato Flakes |
NAICS | 311423: Dried and Dehydrated Food Manufacturing |
SIC | 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
55,000
ft2
|
Annual Production | 30,400,000
lb
|
Production Hrs. Annual | 7,680
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $173,768 | 3,519,701 |
kWh
|
$0.049 |
Electricity Demand | $33,379 | 7,042 |
kW-mo/yr
|
$4.74 |
Natural Gas | $1,446,365 | 302,113 |
MMBtu
|
$4.79 |
TOTAL YEARLY COSTS | $1,653,512 | |||
RECOMMENDED SAVINGS* | $302,958 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $302,958 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Natural Gas Savings |
---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $208,300 | $1,070,720 |
$208,300
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $72,320 | $46,000 |
$72,320
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $16,698 | $11,570 |
$16,698
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $5,640 | $3,090 |
$5,640
-
MMBtu
|
|
TOTAL RECOMMENDED | $302,958 | $1,131,380 |
$302,958
-
MMBtu
|
||
TOTAL IMPLEMENTED | $302,958 | $1,131,380 |
$302,958
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs