UU0263 #12 Y:2024 | 12 | 2024 | Replace fossil fuel equipment with electrical equipment | $32,910 | $158,576 |
n/a
|
UU0263 #11 Y:2024 | 11 | 2024 | Apply for tax-free status for energy purchases | $8,090 | $5,000 |
n/a
|
UU0263 #10 Y:2024 | 10 | 2024 | Pay utility bills on time | $1,860 | $1,500 |
n/a
|
UU0263 #09 Y:2024 | 09 | 2024 | Optimize plant power factor | $3,940 | $9,000 |
n/a
|
UU0263 #08 Y:2024 | 08 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $945 | $3,580 |
n/a
|
UU0263 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $5,270 | $7,380 |
n/a
|
UU0263 #06 Y:2024 | 06 | 2024 | Purchase gas directly from a contract gas supplier | $4,840 | $11,200 |
n/a
|
UU0263 #05 Y:2024 | 05 | 2024 | Repair faulty insulation in furnaces, boilers, etc | $3,948 | $2,110 |
n/a
|
UU0263 #04 Y:2024 | 04 | 2024 | Use waste heat from hot flue gases to preheat | $1,805 | $8,150 |
n/a
|
UU0263 #03 Y:2024 | 03 | 2024 | Use proper thickness of insulation on building envelope | $1,365 | $1,730 |
n/a
|
UU0263 #02 Y:2024 | 02 | 2024 | Improve air circulation with destratification fans / other methods | $7,105 | $5,100 |
n/a
|
UU0263 #01 Y:2024 | 01 | 2024 | Install common header on compressors | $7,583 | $46,630 |
n/a
|
UU0262 #08 Y:2024 | 08 | 2024 | Optimize plant power factor | $5,129 | $12,300 |
n/a
|
UU0262 #07 Y:2024 | 07 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,117 | $834 |
n/a
|
UU0262 #06 Y:2024 | 06 | 2024 | Minimize operation of equipment maintained in standby condition | $720 | $1,680 |
n/a
|
UU0262 #05 Y:2024 | 05 | 2024 | Use or replace with energy efficient substitutes | $762 | $2,640 |
n/a
|
UU0262 #04 Y:2024 | 04 | 2024 | Reduce air conditioning load by evaporating water from roof | $13,561 | $178,488 |
n/a
|
UU0262 #03 Y:2024 | 03 | 2024 | Insulate bare equipment | $24,314 | $29,878 |
n/a
|
UU0262 #02 Y:2024 | 02 | 2024 | Use waste heat to produce steam to drive a steam turbine-generator | $14,276 | $180,000 |
n/a
|
UU0262 #01 Y:2024 | 01 | 2024 | Use waste heat steam for absorption refrigeration | $12,361 | $217,800 |