ITAC Assessment: UU0290
ITAC logo
ITAC Assessment: UU0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product safety
NAICS 922120: Police Protection
SIC 8111: Legal Services
Sales Range less than $500
k
# of Employees 230
Plant Area 25,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,600 988,880
kWh
Electricity Demand $32,314 1,980
kW-mo/yr
Electricity Fees $18,907 -
Natural Gas $9,160 2,790
MMBtu
TOTAL YEARLY COSTS $95,980
RECOMMENDED SAVINGS* $20,676 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $760 $2,640 $760
21,120
kWh
- -
02 2.7231: Use radiant heater for spot heating $2,009 $9,880 $888
25,810
kWh
$58
-
kW-mo/yr
$1,063
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $701 $5,300 $244
6,780
kWh
$457
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $15,860 $186,580 $9,287
257,970
kWh
$6,573
-
kW-mo/yr
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,346 $3,890 $217
6,300
kWh
$17
-
kW-mo/yr
$1,112
-
MMBtu
TOTAL RECOMMENDED $20,676 $208,290 $11,396
317,980
kWh
$7,105
-
kW-mo/yr
$2,175
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs