Assessment Year | 1986 |
---|---|
Principal Product | PRINTED PAPER |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 11,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $354,631 | 6,458,968 |
kWh
|
$0.055 |
Natural Gas | $108,700 | 26,456 |
MMBtu
|
$4.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,726 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,489 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $109,167 | $1,000,000 |
$331,148
6,031,946
kWh
|
$(-221,981.0)
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,883 | $10,000 |
$14,883
271,102
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,269 | $20 |
$2,269
41,325
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $418 | $700 |
$418
7,620
kWh
|
- | - | |
05 | 2.1123: Install automatic stack damper | $3,144 | $3,000 | - |
$3,144
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $882 | $2,000 | - |
$1,032
-
MMBtu
|
$(-150.0) | |
07 | 2.2422: Use waste heat from hot flue gases to generate steam | $801 | $1,400 | - |
$801
-
MMBtu
|
- | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $160 | - | - |
$160
-
MMBtu
|
- | |
09 | 2.4312: Improve lubrication practices | $6,002 | $4,500 |
$6,002
109,320
kWh
|
- | - | |
TOTAL RECOMMENDED | $137,726 | $1,021,620 |
$354,720
6,461,313
kWh
|
$(-216,844.0)
-
MMBtu
|
$(-150.0) | ||
TOTAL IMPLEMENTED | $25,489 | $20,200 |
$21,303
388,042
kWh
|
$4,336
-
MMBtu
|
$(-150.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs