ITAC Assessment: UU0291
ITAC logo
ITAC Assessment: UU0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Electro-mechanical devices
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 360
Plant Area 125,000
ft2
Annual Production 150,000
units
Production Hrs. Annual 5,600
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,468 3,428,240
kWh
Electricity Demand $118,026 8,453
kW-mo/yr
Electricity Fees $21,763 -
Natural Gas $18,177 2,300
MMBtu
TOTAL YEARLY COSTS $372,434
RECOMMENDED SAVINGS* $70,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,270 $5,900 $12,360
196,200
kWh
$4,910
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $5,305 $12,840 $3,920
62,200
kWh
$1,385
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,137 $10,470 $4,460
70,780
kWh
$677
-
kW-mo/yr
-
04 2.3141: Use battery storage for demand control $42,705 $212,840 - $17,705
-
kW-mo/yr
$25,000
TOTAL RECOMMENDED $70,417 $242,050 $20,740
329,180
kWh
$24,677
-
kW-mo/yr
$25,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs