Assessment Year | 1986 |
---|---|
Principal Product | POULTRY FEED |
NAICS |
n/a
|
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $50 M to 100M |
# of Employees | 235 |
Plant Area |
n/a
|
Annual Production | 350,000
ton
|
Production Hrs. Annual | 7,114
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $540,304 | 11,791,911 |
kWh
|
$0.046 |
Natural Gas | $221,013 | 49,369 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,062 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,624 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,015 | - | - |
$3,615
-
MMBtu
|
$(-600.0) | |
02 | 2.2121: Increase amount of condensate returned | $1,452 | - | - |
$1,452
-
MMBtu
|
- | |
03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $9,811 | $8,000 | - |
$9,811
-
MMBtu
|
- | |
04 | 2.2135: Repair and eliminate steam leaks | $848 | $140 | - |
$848
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $1,025 | $113 | - |
$1,025
-
MMBtu
|
- | |
06 | 2.3212: Optimize plant power factor | $12,627 | $7,140 |
$12,627
-
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,034 | $422 |
$3,034
70,340
kWh
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,250 | - |
$1,250
36,635
kWh
|
- | - | |
TOTAL RECOMMENDED | $33,062 | $15,815 |
$16,911
106,975
kWh
|
$16,751
-
MMBtu
|
$(-600.0) | ||
TOTAL IMPLEMENTED | $10,624 | $675 |
$4,284
106,975
kWh
|
$6,940
-
MMBtu
|
$(-600.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs