ITAC Assessment: KU0228
ITAC logo
ITAC Assessment: KU0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLASTIC PUMPS & SPRAYERS
NAICS
n/a
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 100,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,945 13,021,981
kWh
Natural Gas $13,034 3,436
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,376 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,193

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $16,760 - $16,760
320,633
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,815 $14,465 $10,815
206,917
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $7,841 - $1,716
32,825
kWh
$6,125
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,401 $700 $3,401
65,064
kWh
-
05 2.6121: Reduce hot water temperature to the minimum required $1,064 - $858
16,413
kWh
$206
-
MMBtu
06 2.1123: Install automatic stack damper $1,550 $700 - $1,550
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $919 $1,700 $919
17,585
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $873 $50 $873
16,706
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $153 - $153
2,931
kWh
-
TOTAL RECOMMENDED $43,376 $17,615 $35,495
679,074
kWh
$7,881
-
MMBtu
TOTAL IMPLEMENTED $24,193 $16,865 $17,862
341,735
kWh
$6,331
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs