ITAC Assessment: WM0002
ITAC logo
ITAC Assessment: WM0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Industrial Radiators
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 175,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,491 1,659,600
kWh
Electricity Demand $86,653 7,632
kW-mo/yr
Electricity Fees $54,563 -
Natural Gas $58,676 6,130
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3137: Use power during off-peak periods $56,454 - - $47,711
-
kW-mo/yr
$8,743 - -
02 2.7134: Use photocell controls $875 $750 $875
13,172
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $52,844 $55,770 $36,265
506,189
kWh
$16,579
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $243 $30 $243
3,475
kWh
- - - -
05 2.2511: Insulate bare equipment $1,425 $500 - - - $1,425
-
MMBtu
-
06 2.4224: Upgrade controls on compressors $11,459 - $11,459
159,952
kWh
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,884 - - - - - $2,884
-
lb
TOTAL RECOMMENDED $126,184 $57,050 $48,842
682,788
kWh
$64,290
-
kW-mo/yr
$8,743 $1,425
-
MMBtu
$2,884
-
lb
TOTAL IMPLEMENTED $55,728 $55,770 $36,265
506,189
kWh
$16,579
-
kW-mo/yr
- - $2,884
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs