Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Education
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 20
Plant Area 90,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,768
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,576 459,900
kWh
Electricity Demand $41,590 2,554
kW-mo/yr
Electricity Fees $15,364 -
Natural Gas $6,187 1,688
MMBtu
TOTAL YEARLY COSTS $79,717
RECOMMENDED SAVINGS* $39,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3141: Use battery storage for demand control $9,476 $40,110 $(-291.6)
(-8,100)
kWh
$9,768
-
kW-mo/yr
-
02 2.7231: Use radiant heater for spot heating $1,570 $9,150 $141
3,920
kWh
$82
-
kW-mo/yr
$1,347
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $490 $3,590 $490
13,600
kWh
- -
04 2.9114: Use solar heat to make electricty $24,834 $237,360 $11,826
328,500
kWh
$13,008
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $400 $1,510 $400
11,150
kWh
- -
06 2.7311: Ventilation system to shut off when room is not in use $2,544 $2,000 $981
27,260
kWh
$1,563
-
kW-mo/yr
-
TOTAL RECOMMENDED $39,314 $293,720 $13,546
376,330
kWh
$24,421
-
kW-mo/yr
$1,347
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs