| Assessment Year | 2004 |
|---|---|
| Principal Product | Lumber |
| NAICS | 321113: Sawmills |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
250,000
ft2
|
| Annual Production | 235,000,000
thousand feet
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,056,226 | 30,615,254 |
kWh
|
$0.034 |
| Electricity Demand | $379,562 | 65,157 |
kW-mo/yr
|
$5.83 |
| Electricity Fees | $444,194 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $115,085 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,456 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $56,439 | $32,850 |
$27,771
804,960
kWh
|
$6,197
-
kW-mo/yr
|
$22,471 | |
| 02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $15,412 | $1,518 |
$6,347
183,961
kWh
|
$3,396
-
kW-mo/yr
|
$5,669 | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $14,422 | $20,370 |
$6,412
185,861
kWh
|
$2,526
-
kW-mo/yr
|
$5,484 | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,889 | $406 |
$7,369
213,587
kWh
|
- | $5,520 | |
| 05 | 2.7124: Make a practice of turning off lights when not needed | $9,490 | $6,318 |
$5,426
157,271
kWh
|
- | $4,064 | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $3,878 | $3,710 |
$2,217
64,262
kWh
|
- | $1,661 | |
| 07 | 2.7221: Lower temperature during the winter season and vice-versa | $918 | $2,125 |
$525
15,215
kWh
|
- | $393 | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $822 | $1,969 |
$405
11,730
kWh
|
$90
-
kW-mo/yr
|
$327 | |
| 09 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $815 | $444 |
$466
13,509
kWh
|
- | $349 | |
| TOTAL RECOMMENDED | $115,085 | $69,710 |
$56,938
1,650,356
kWh
|
$12,209
-
kW-mo/yr
|
$45,938 | ||
| TOTAL IMPLEMENTED | $44,456 | $24,863 |
$21,119
612,133
kWh
|
$5,922
-
kW-mo/yr
|
$17,415 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs