ITAC Assessment: UU0284
ITAC logo
ITAC Assessment: UU0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Outpatient Clinic
NAICS 621498: All Other Outpatient Care Centers
SIC 8093: Specialty Outpatient Facilities, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 130
Plant Area 138,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,360
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,613 3,294,600
kWh
Electricity Demand $125,142 7,618
kW-mo/yr
Electricity Fees $85,908 -
Natural Gas $95,688 19,201
MMBtu
TOTAL YEARLY COSTS $426,351
RECOMMENDED SAVINGS* $68,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $900 $1,050 $325
8,960
kWh
$575
-
kW-mo/yr
-
02 2.2622: Replace existing chiller with high efficiency model $9,414 $47,500 $6,227
171,530
kWh
$3,187
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,230 $17,500 $1,176
32,360
kWh
$2,054
-
kW-mo/yr
-
04 2.7229: Air condition only space necessary $54,580 $163,800 $10,389
286,200
kWh
$18,345
-
kW-mo/yr
$25,846
-
MMBtu
TOTAL RECOMMENDED $68,124 $229,850 $18,116
499,050
kWh
$24,162
-
kW-mo/yr
$25,846
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs