Assessment Year | 2025 |
---|---|
Principal Product | Outpatient Clinic |
NAICS | 621498: All Other Outpatient Care Centers |
SIC | 8093: Specialty Outpatient Facilities, Not Elsewhere Classified |
Sales Range | less than $500 k |
# of Employees | 130 |
Plant Area |
138,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 3,360
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,613 | 3,294,600 |
kWh
|
$0.036 |
Electricity Demand | $125,142 | 7,618 |
kW-mo/yr
|
$16.43 |
Electricity Fees | $85,908 | - |
|
- |
Natural Gas | $95,688 | 19,201 |
MMBtu
|
$4.98 |
TOTAL YEARLY COSTS | $426,351 | |||
RECOMMENDED SAVINGS* | $104,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $900 | $1,050 |
$325
8,960
kWh
|
$575
-
kW-mo/yr
|
- | |
02 | 2.2622: Replace existing chiller with high efficiency model | $10,400 | $45,000 |
$10,400
100,000
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,250 | $17,500 |
$3,250
32,360
kWh
|
- | - | |
04 | 2.7234: Use heat pump for space conditioning | $22,049 | $500,000 |
$(-39,212.0)
(-1,089,226)
kWh
|
$(-29,574.0)
-
kW-mo/yr
|
$90,835
-
MMBtu
|
|
05 | 2.1224: Replace boiler | $12,300 | $145,590 | - | - |
$12,300
-
MMBtu
|
|
06 | 2.7229: Air condition only space necessary | $55,611 | $54,580 |
$29,765
286,200
kWh
|
- |
$25,846
-
MMBtu
|
|
TOTAL RECOMMENDED | $104,510 | $763,720 |
$4,528
(-661,706)
kWh
|
$(-28,999.0)
-
kW-mo/yr
|
$128,981
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs