Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,016

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0462 #05 Y:2025 Clean or color roof to reduce solar load $4,587 $19,764
MS0462 #03 Y:2025 Install occupancy sensors $868 $1,889
MS0462 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,048 $1,973
MS0462 #01 Y:2025 Use most efficient type of electric motors $533 $3,825
MS0452 #03 Y:2025 Condense operation into one building $26,400 $60,000
MS0452 #01 Y:2025 Change procedures / equipment / operating conditions $40,000 $43,390
MS0449 #06 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $21,369 $10,437
MS0449 #04 Y:2025 Air condition only space necessary $11,235 $15,450
MS0449 #03 Y:2025 Upgrade obsolete equipment $10,000 $18,185
MS0449 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,428 $5,389
MS0449 #01 Y:2025 Install replacement doors $13,143 $8,336
MS0445 #07 Y:2025 Use / purchase optimum sized compressor $27,723 $35,999
MS0445 #03 Y:2025 Change rate schedules or other changes in utility service $395 -
MS0444 #04 Y:2025 Level zero – install control systems for existing equipment $52,643 $67,500
MS0444 #03 Y:2025 Install occupancy sensors $1,624 $2,466
MS0444 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,814 $400
LS2507 #04 Y:2024 Use or replace with energy efficient substitutes $12,714 $65,000
LS2507 #03 Y:2024 Replace fossil fuel equipment with electrical equipment $44,252 $192,732
LS2507 #02 Y:2024 Install sub-metering equipment $3,463 $3,000
LS2507 #01 Y:2024 Install timers and/or thermostats $1,382 $525