ITAC Assessment: TT0293
ITAC logo
ITAC Assessment: TT0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Dump Truck Beds
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 200,000
ft2
Annual Production 500
units
Production Hrs. Annual 2,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,806 2,312,143
kWh
Electricity Demand $104,381 7,809
kW-mo/yr
Natural Gas $167,016 15,576
MMBtu
LPG $9,672 285
MMBtu
Waste Disposal Costs
Water Usage $1,010 179
Tgal
Water Disposal $3,600 179
Tgal
TOTAL YEARLY COSTS $453,485
RECOMMENDED SAVINGS* $52,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,707 $1,500 $10,120
139,392
kWh
$10,587
-
kW-mo/yr
- -
02 2.1321: Replace fossil fuel equipment with electrical equipment $10,120 - $(-1,892.0)
(-26,060)
kWh
- $9,672
-
MMBtu
$2,340
03 2.4224: Upgrade controls on compressors $7,910 $600 $7,910
108,953
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $6,615 $31,320 $6,615
91,118
kWh
- - -
05 2.4237: Substitute compressed air cooling with water or air cooling $3,025 $10,040 $3,025
41,677
kWh
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $2,199 - $2,199
30,295
kWh
- - -
07 2.4112: Install soft-start to eliminate nuisance trips $923 $1,600 $21
294
kWh
- - $902
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $736 $170 $676
9,314
kWh
$60
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $630 $2,000 $630
8,630
kWh
- - -
TOTAL RECOMMENDED $52,865 $47,230 $29,304
403,613
kWh
$10,647
-
kW-mo/yr
$9,672
-
MMBtu
$3,242
TOTAL IMPLEMENTED $49,840 $37,190 $26,279
361,936
kWh
$10,647
-
kW-mo/yr
$9,672
-
MMBtu
$3,242
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs