Assessment Year | 2023 |
---|---|
Principal Product | Dump Truck Beds |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
200,000
ft2
|
Annual Production | 500
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $167,806 | 2,312,143 |
kWh
|
$0.073 | |
Electricity Demand | $104,381 | 7,809 |
kW-mo/yr
|
$13.37 | |
Natural Gas | $167,016 | 15,576 |
MMBtu
|
$10.72 | |
LPG | $9,672 | 285 |
MMBtu
|
$33.94 | |
Waste Disposal Costs | |||||
Water Usage | $1,010 | 179 |
Tgal
|
$5.64 | |
Water Disposal | $3,600 | 179 |
Tgal
|
$20.11 | |
TOTAL YEARLY COSTS | $453,485 | ||||
RECOMMENDED SAVINGS* | $52,865 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $49,840 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,707 | $1,500 |
$10,120
139,392
kWh
|
$10,587
-
kW-mo/yr
|
- | - | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $10,120 | - |
$(-1,892.0)
(-26,060)
kWh
|
- |
$9,672
-
MMBtu
|
$2,340 | |
03 | 2.4224: Upgrade controls on compressors | $7,910 | $600 |
$7,910
108,953
kWh
|
- | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $6,615 | $31,320 |
$6,615
91,118
kWh
|
- | - | - | |
05 | 2.4237: Substitute compressed air cooling with water or air cooling | $3,025 | $10,040 |
$3,025
41,677
kWh
|
- | - | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,199 | - |
$2,199
30,295
kWh
|
- | - | - | |
07 | 2.4112: Install soft-start to eliminate nuisance trips | $923 | $1,600 |
$21
294
kWh
|
- | - | $902 | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $736 | $170 |
$676
9,314
kWh
|
$60
-
kW-mo/yr
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $630 | $2,000 |
$630
8,630
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $52,865 | $47,230 |
$29,304
403,613
kWh
|
$10,647
-
kW-mo/yr
|
$9,672
-
MMBtu
|
$3,242 | ||
TOTAL IMPLEMENTED | $49,840 | $37,190 |
$26,279
361,936
kWh
|
$10,647
-
kW-mo/yr
|
$9,672
-
MMBtu
|
$3,242 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs