ITAC Assessment: CC0014
ITAC logo
ITAC Assessment: CC0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Polyester Automotive Seating and Headliner Fabric
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2259: Knitting Mills, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 241
Plant Area 367,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $645,493 17,535,764
kWh
Electricity Demand $446,588 33,876
kW-mo/yr
Electricity Fees $(-4,720.0) -
Natural Gas $860,627 136,790
MMBtu
TOTAL YEARLY COSTS $1,947,987
RECOMMENDED SAVINGS* $110,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,512 $1,000 $2,356
64,018
kWh
$1,156
-
kW-mo/yr
-
02 2.7226: Use computer programs to optimize hvac performance $7,788 $800 - - $7,788
-
MMBtu
03 2.6218: Turn off equipment when not in use $4,768 $1,000 $4,768
129,563
kWh
- -
04 2.6218: Turn off equipment when not in use $6,527 $2,000 $6,527
177,368
kWh
- -
05 2.2511: Insulate bare equipment $41,841 $26,106 - - $41,841
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,695 $11,000 $7,721
209,801
kWh
$2,974
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $34,932 $53,322 $22,194
603,084
kWh
$12,738
-
kW-mo/yr
-
TOTAL RECOMMENDED $110,063 $95,228 $43,566
1,183,834
kWh
$16,868
-
kW-mo/yr
$49,629
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs