ITAC Assessment: MA0068
ITAC logo
ITAC Assessment: MA0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product FELT
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 230
Plant Area
n/a
Annual Production 4,680,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $322,158 5,877,198
kWh
Fuel Oil #6 $360,000 91,930
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,166

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.7245: Use direct air supply to exhaust hoods $10,397 $4,021 $(-610.0)
(-11,137)
kWh
$11,007
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $16,205 $165 $893
16,413
kWh
$15,312
-
MMBtu
03 2.7444: Close holes and openings in building such as broken windows $1,226 $100 - $1,226
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $8,103 $20,000 - $8,103
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $9,940 $50 - $9,940
-
MMBtu
06 2.1213: Direct warmest air to combustion intake $3,079 $1,500 - $3,079
-
MMBtu
TOTAL RECOMMENDED $48,950 $25,836 $283
5,276
kWh
$48,667
-
MMBtu
TOTAL IMPLEMENTED $11,166 $150 - $11,166
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs