ITAC Assessment: KU0191
ITAC logo
ITAC Assessment: KU0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product FOOD HEAT & REFRIG EQUIPMENT
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 27
Plant Area
n/a
Annual Production 10,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,196 293,083
kWh
Natural Gas $11,919 2,626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,763

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,594 $2,592 $3,594
34,877
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,988 - $3,088
-
kWh
- $(-100.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $423 $100 $423
4,103
kWh
- -
04 2.6214: Shut off pilots in standby equipment $221 - - $241
-
MMBtu
$(-20.0)
05 2.1233: Analyze flue gas for proper air/fuel ratio $525 - - $645
-
MMBtu
$(-120.0)
06 2.4312: Improve lubrication practices $151 $138 $151
1,465
kWh
- -
TOTAL RECOMMENDED $7,902 $2,830 $7,256
40,445
kWh
$886
-
MMBtu
$(-240.0)
TOTAL IMPLEMENTED $4,763 $2,692 $4,017
38,980
kWh
$886
-
MMBtu
$(-140.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs