ITAC Assessment: MS0417
ITAC logo
ITAC Assessment: MS0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Automotive Body Structure
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 310,000
ft2
Annual Production 6,000,496
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $787,709 10,940,400
kWh
Electricity Demand $277,380 27,738
kW-mo/yr
Electricity Fees $74,743 -
Natural Gas $10,887 798
MMBtu
Waste Disposal Costs
Water Usage $1,364 11,301
Tgal
TOTAL YEARLY COSTS $1,152,082
RECOMMENDED SAVINGS* $216,320 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7135: Install occupancy sensors $1,912 $3,171 $1,912
27,317
kWh
02 2.7446: Utilize sensors controlling roof and wall openings $2,264 $21,500 $2,264
31,445
kWh
03 2.4239: Eliminate or reduce compressed air usage $1,886 $2,761 $1,886
26,197
kWh
04 2.9114: Use solar heat to make electricty $210,258 $2,164,995 $210,258
2,920,250
kWh
TOTAL RECOMMENDED $216,320 $2,192,427 $216,320
3,005,209
kWh
TOTAL IMPLEMENTED $1,886 $2,761 $1,886
26,197
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs